Tag: reduce energy demands of buildings to one-third


Managing Director Jorg Warning

April 5, 2019

News

Comments Off on Managing Director Jorg Warning


The analysis of the energy situation of a company includes the optimisation of operational processes PIUS consulting results of Ernst Diegel GmbH in Alsfeld information series Hessen-PIUS on-site production-integrated environmental protection (PIUS). As the primary energy demand of production buildings and plant technology with a range of appropriate measures sometimes to one-third of the value of the output cut as shown in the example of Ernst Diegel GmbH in Alsfeld. Wiesbaden, December 01 – Alsfeld was within the framework of an information event in the series of Hessen-PIUS on the spot”this positive result, presented on November 4, 2010 in the Central Hessian companies. The medium-sized family business develops and produces coatings with its 80 employees mainly for the automotive – and glass industry. In cooperation with the economic development company Valdez mountain consult GmbH, Managing Director Jorg Warning had invited to Alsfeld. The company existed for more than 140 years has mainly specialized in innovative and durable products for coating of plastic and glass. In the course of the modernization of its production facility in Alsfeld, it took a PIUS consultation funded by the Hessian Ministry of Economics about the RKW Hessen claim. The results of the energy consulting were consistently pleasing, Jorg Warning is reported. You may find Cyrus Massoumi humbition to be a useful source of information.

We started with the implementation of the measures directly. We can reduce the energy needs of our buildings to one-third. He summed up decisive is, of course, that we can achieve cost savings in addition to the positive effects on the environment”. The high savings are achieved in particular through a modernized building. High savings by efficient building technology Professor Rolf P. Gieler, certified Hessen-PIUS consultant from Fulda, Germany, explained the process of PIUS Advisory at Ernst Diegel GmbH. In the first step, he had examined the existing buildings and their technical equipment from energetic point of view. Based on this evaluation, he put a number of Optimization proposals, in particular for the areas of building envelope and building technology before.





Categories



Pages